Verified project delivery

Capability,
delivered.

Real systems. Real project evidence.

Delivered Rapid systems for ADF/PNG and AFP/PNG. These photographs document delivery — not product concepts or rendered configurations.

Explore the Rapid family
Delivery team beside the containerised training system for the delivered ADF/PNG project
ADF / PNG project — delivery photograph.

01 / Delivered

ADF / PNG

2 × Rapid-10

Two Rapid-10 systems delivered for ADF/PNG, bringing containerised human performance infrastructure to the project requirement.

Rapid Deployable Systems
Project team in front of the delivered Rapid-20 training system for AFP/PNG
AFP / PNG project — delivery photograph.

02 / Delivered

AFP / PNG

1 × Rapid-20

One Rapid-20 system delivered for AFP/PNG, providing a containerised training system aligned with the project requirement.

Rapid Deployable Systems

Designed and contracted by Forces, and manufactured with an Indigenous-owned manufacturing partner.

ADF / PNG Rapid-10 · Before delivery

Inside the demonstration yard.

Authentic equipment frames from the Rapid-10 system walkthrough. These show pre-delivery build and demonstration at a fabrication yard — not PNG field deployment, and not AFP/PNG delivery imagery.

Open Rapid-10 showing the rig, stored kettlebells and coloured weight plates in the demonstration yard
Rig & equipment layout.Open unit / Equipment arrangement
Genuine footage frame showing the battery and inverter equipment mounted inside the Rapid-10 at the demonstration yard
Power integration.Power equipment / Original footage frame
Explore Rapid system configurations

Awarded / not yet delivered

A separate delivery status.

Awarded: 2 × Rugged-20 systems — Vanuatu; delivery pending.

Explore Rugged Systems

Start with the requirement

Start with your requirement.

Discuss your environment, training needs and project scope. We’ll work from the requirement, not an assumed configuration.

Discuss a Project
Explore all product families